Figure 3-58
Positions of adjustable guide rails 21242247 and floating nuts
Front
Rear
1U
For adjustable
guide rail screws
Start position of the
adjustable guide rail
For floating nuts
Positioning block
(device nuts)
2.
Install the floating nuts that match M6 screws at the positions marked in
,
illustrates how to install a floating nut.
Figure 3-59
Installing floating nuts
2
3
1
3.
Install guide rails. As for adjustable guide rails, identify the left and right guide rails, and
the front and rear ends of each guide rail according to the F/L and F/R flags on the guide
rails.
Use M6 screws to fix the L-shape guide rails at the positions specified in
, as
shown in
HUAWEI USG6000 Series
Hardware Guide
3 Hardware Installation
Issue 08 (2017-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
310