l
The power switch in the equipment room is easy to locate so that you can power off
devices in the case of accidents.
Procedure
l
Power on the USG.
The USG starts after the switch of the power supply device is turned on.
You can identify the USG status based on indicators on the front panel. Indicators shown
in
indicate that the USG is running normally.
Figure 3-20
Indicators when the USG6305/6305-W/6310S/6310S-W/6310S-WL-OVS/
6510/6510-WL runs normally
PWR SYS ALM USB microSD
Secospace USG6000
0
1
2
3
4
5
6
7
ETH
2.4G
WLAN
5G
LTE
WWAN
3G/2G
PWR SYS ALM USB
micro
SD
PWR: steady green
ALM: off
SYS: blinking green
(once every two seconds)
l
Power off the USG.
NOTICE
Before powering off the USG, ensure that configuration data is saved. Otherwise, the
configuration data may be lost.
If the USG will be administratively shut down for a long time, turn off the power switch.
After powering off the USG, set it aside properly according to storage requirements.
----End
Follow-up Procedure
After the USG is powered on, you can log in to the configuration page for management and
maintenance. For details, refer to the
Administrator Guide
.
3.3 Installing a Desktop Device (USG6310/6320)
This chapter provides the cabinet-mounting, workbench-mounting, wall-mounting, and cable
connection methods of the USG6310/6320.
HUAWEI USG6000 Series
Hardware Guide
3 Hardware Installation
Issue 08 (2017-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
269