5
Operations
5.1 Checking Before Powering On the UPS
●
AC power cable colors comply with local electrical regulations.
●
No short circuits occur in inputs and outputs.
●
Cables are securely connected.
●
Battery cables are correctly connected to battery terminals. The battery
voltage meets the requirements.
●
Cables are properly connected between the UPS and batteries.
●
Input circuit breakers and load circuit breakers are OFF.
●
Power cables and signal cables are correctly identified.
●
The input phase sequence is correct.
●
Cables are neatly routed and securely bound.
●
Devices are installed and cables are routed in ways that facilitate
modification, capacity expansion, and maintenance.
●
Parallel cables are properly connected.
●
The UPS is properly grounded.
●
The voltage between the neutral wire and the ground cable is less than 5 V
AC.
●
The input voltage rang for the mains to start the UPS is 120–280 V AC (or 80–
280 V AC after the UPS powers on). The battery voltage range is (Number of
batteries x 10.8)–280 V DC.
5.2 Single UPS Operations
This section describes operations on a single 15 kVA/20 kVA UPS.
5.2.1 Installing Cables
UPS2000-G- (6 kVA-20 kVA)