FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
6 Power-On Commissioning
Issue 02 (2017-01-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
41
System
Check Item Content
Check Standard
Civil air
conditioner
(optional)
See
document
s
delivered
with the
civil air
conditione
r.
-
Management
system
Power-on
commissioni
ng for the
monitoring
components
Hydrogen
collector
The hydrogen density displayed on the
hydrogen collector is 0% or 1%.
Hydrogen
sensor
Camera
The red indicator inside the camera is on.
VCN500
The green power indicator of the VCN500
is steady on.
If the ACT indicator blinks green, data
transmission is normal.
If the Active indicator of the hard disk
blinks green, data can be read from the
hard disk properly.
RH2288
server
The power indicator of the RH2288 server is
normal.
LAN
switch
The PWR1, PWR2, and SYS indicators are
on.
ECC500
The Power indicator on the main control
board is on.
The PWR and RUN indicators on the
MUE and MUS modules are on.
Independe
ntly
deployed
modules
The PWR and RUN indicators are on.
Water
sensor
The power indicator is on.
Polymer
temperatu
re and
humidity
(T/H)
sensor
Displays the temperature and humidity values.
Intelligent
battery
monitorin
g module
The RUN and LINK indicators are on.