FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
4 Preparations for Power-On Commissioning
Issue 02 (2017-01-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5
Tools
Rubber gloves
Step ladder
ESD wrist strap
Heat gun
ESD floor suction plate
Adjustable wrench
RJ45 crimping tool
Wire stripper
Mobile lights
Hand-held thermometer
Heat shrink tubing
Phase-sequence meter
Clamp meter
Insulation megohmmeter
-
4.2 Obtaining Technical Documents
lists the technical documents required for FusionModule1000 power-on
commissioning.