Labeling the cables
The StoreOnce capacity upgrade kit (enclosure) includes a sheet of preprinted cable label pairs. Each
pair contains two identical labels, one for each end of the SAS cable.
• N = Node (server node)
• S = Slot
• P = Port
• J = JBOD
• I = I/O module
Apply the correct pair of labels to each SAS cable as you cable the storage enclosure.
Cabling the first capacity upgrade kit (JBOD 1)
Procedure
1.
Apply the "JBOD1" label to the top-left pull-out tab at the rear of the enclosure.
2.
Apply the cable label to the new SAS cable.
SAS cable
Label color
New label
New 0.5 m cable
Red
N:S6:P1 - J1:I1:P1
3.
Cable the enclosure as shown.
Installing capacity upgrade kits
81