![HPE StoreOnce 3620 Скачать руководство пользователя страница 91](http://html1.mh-extra.com/html/hpe/storeonce-3620/storeonce-3620_installation-manual_2175897091.webp)
Apply the correct pair of labels to each SAS cable as you cable the storage enclosure.
Cabling the first capacity upgrade kit (JBOD 2)
The first capacity upgrade kit is located directly above the server node.
Procedure
1.
Apply the "JBOD2" label to the top-left pull-out tag at the rear of the enclosure.
2.
Apply the cable labels to the new SAS cables.
SAS cable
Label color
Cable label
New 1 m cable
Red
N:S6:P1 - J2:I1:P1
New 2 m cable
Green
N:S6:P2 - J
F
:I2:P1
White
F
=2
3.
Cable the enclosure as shown.
1
2
3
4
5
Figure 29: Cabling the first capacity upgrade kit (JBOD 2)
Item
Description
1
JBOD 2: First capacity upgrade kit.
2
Server node.
3
JBOD 1: Base enclosure.
Item
SAS cable
Label colors
Cable from
To
4
New 1 m cable
Red
Node Slot 6 Port 1
JBOD 2 IOM 1 Port 1
5
New 2 m cable
Green and White
Node Slot 6 Port 2
JBOD 2 IOM 2 Port 1
4.
If you are finished installing capacity upgrade kits, skip to
Cabling the second capacity upgrade kit (JBOD 3)
The second capacity upgrade kit is located directly under JBOD 1.
Installing capacity upgrade kits
91