1
2
3
4
5
6
7
Item Description
1
JBOD 2: First upgrade enclosure.
2
Server node.
3
JBOD 1: Base enclosure.
Item SAS cable
Label colors
Cable from
To
4
New 0.5 m cable
Red
JBOD 2 Drawer 2 IOM A
Port 1
JBOD 2 Drawer 1 IOM A
Port 2
5
New 0.5 m cable
Green
JBOD 2 Drawer 2 IOM B
Port 1
JBOD 2 Drawer 1 IOM B
Port 2
6
New 1 m cable
Red
Node Slot 6 Port 1
JBOD 2 Drawer 1 IOM A
Port 1
7
New 2 m cable
Green and white
Node Slot 6 Port 2
JBOD 2 Drawer 2 IOM B
Port 2
4.
If you are finished installing capacity upgrade storage enclosures, skip to
If you purchased additional HPE StoreOnce 5250/5650 44 TB or 88 TB Capacity Upgrade Kits (disk
packs), install them after the storage enclosures have powered on successfully.
Cabling the second upgrade enclosure (JBOD 3)
The second upgrade enclosure is the lowest in the rack, located below JBOD 1.
116
Installing capacity upgrade kits