![HPE StoreOnce 3620 Скачать руководство пользователя страница 95](http://html1.mh-extra.com/html/hpe/storeonce-3620/storeonce-3620_installation-manual_2175897095.webp)
Item
Description
1
JBOD 4: Third capacity upgrade kit.
2
JBOD 2: First capacity upgrade kit.
3
Server node.
4
JBOD 1: Base enclosure.
5
JBOD 3: Second capacity upgrade kit.
6
JBOD 5: Fourth capacity upgrade kit.
Item
SAS cable
Label colors
Cable from
To
7
New 0.5 m cable
Red
JBOD 3 IOM 1 Port 2
JBOD 5 IOM 1 Port 1
8
New 0.5 m cable
Green
JBOD 5 IOM 2 Port 2
JBOD 3 IOM 2 Port 1
9
Moving 2 m cable
Green and white
Node Slot 3 Port 2
JBOD 5 IOM 2 Port 1
4.
If you are finished installing capacity upgrade kits, skip to
Cabling the fifth capacity upgrade kit (JBOD 6)
The fifth capacity upgrade kit is the highest in the rack, located directly above JBOD 4.
Procedure
1.
Apply the "JBOD6" label to the top-left pull-out tag at the rear of the enclosure.
2.
Apply the cable labels to the new SAS cables. On the moving SAS cable, replace the "
F
=4" label with
the "
F
=6" label.
SAS cable
Label color
New label
New 0.5 m cable
Red
J4:I1:P2 - J6:I1:P1
New 0.5 m cable
Green
J6:I2:P2 - J4:I2:P1
Moving 2 m cable (N:S6:P2 - J
F
:I2:P1)
White
F
=6
3.
Cable the enclosure as shown.
Installing capacity upgrade kits
95