![HPE StoreOnce 3620 Скачать руководство пользователя страница 117](http://html1.mh-extra.com/html/hpe/storeonce-3620/storeonce-3620_installation-manual_2175897117.webp)
Procedure
1.
Apply the "JBOD3" label to the rear of the enclosure.
2.
Apply the cable labels to the new SAS cables. On the moving 2 m SAS cable, replace the "
F
=1" label
with the "
F
=3" label.
SAS cable
Label color
New label
New 0.5 m cable
Red
J3:D2:IA:P1 - J3:D1:IA:P2
New 0.5 m cable
Green
J3:D2:IB:P1 - J3:D1:IB:P2
New 1 m cable
Red
J1:D2:IA:P2 - J3:D1:IA:P1
New 1 m cable
Green
J1:D2:IB:P2 - J3:D1:IB:P1
Moving 2 m cable (N:S3:P2 - J
F
:D2:IB:P2)
White
F
=3
3.
Cable the second upgrade enclosure (JBOD 3) as shown.
1
2
3
4
5
6
7
8
9
Installing capacity upgrade kits
117