
Storage enclosure drawer, I/O module, and port numbering
D1
D2
IOM A
IOM B
IOM A
IOM B
P2
P1
P2
P1
P2
P1
P2
P1
Cabling the first upgrade enclosure (JBOD 2)
The first upgrade enclosure is located directly above the server node.
Procedure
1.
Apply the "JBOD2" label to the rear of the enclosure.
2.
Apply the cable labels to the new SAS cables. The new 2 m SAS cable also requires the "
F
=2" label.
SAS cable
Label color
New label
New 0.5 m cable
Red
J2:D2:IA:P1 - J2:D1:IA:P2
New 0.5 m cable
Green
J2:D2:IB:P1 - J2:D1:IB:P2
New 1 m cable
Red
N:S6:P1 - J2:D1:IA:P1
New 2 m cable
Green
N:S6:P2 - J
F
:D2:IB:P2
White
F
=2
3.
Cable the first upgrade enclosure (JBOD 2) as shown.
Installing capacity upgrade kits
115