Table 91 Contents of the Logical Path Status of Copy Group Pair Panel
(continued)
Description
Item
Secondary port number
Secondary
Status of each physical path
•
ESTABLISHED
: The physical path has been established.
•
INIT FAILED
: Initialization failed.
•
NO RESOURCES AT PRI
: The port for the primary storage system
is invalid.
•
NO RESOURCES AT SEC
: The port for the secondary storage
system is invalid.
•
SERIAL# MISMATCH
: The storage system serial numbers do not
match.
•
CONFIG ERROR
: The interface ID is invalid.
Status
Confirmation Panels
This section explains panels that are displayed to check the execution of each operation.
Confirm Execution Dissolve Panel
If
d
is specified in
AC
in the Manage Copy Groups panel, the Confirm Execution Dissolve panel
is displayed, prompting you to confirm whether the copy pair is dissolved.
Figure 134 (page 175)
shows the Confirm Execution Dissolve panel.
Figure 134 Confirm Execution Dissolve Panel
“Contents of the Confirm Execution Dissolve Panel” (page 175)
describes the item in the Confirm
Execution Dissolve panel:
Table 92 Contents of the Confirm Execution Dissolve Panel
Description
Item
Specify whether to display the Confirm Execution Dissolve panel. This setting
remains in effect until you return to the Main Menu.
•
Selected: Do not display the Confirm panel when
d
is specified.
•
Cleared: Display the Confirm panel.
Set dissolve execution confirmation
off
Pressing the
Enter
key dissolves the copy pair. Pressing the
F12=Cancel
key cancels the dissolving
of the copy pair.
Confirmation Panels
175
Содержание P9000
Страница 302: ...YKDEMO12 302 CLI Commands ...