
11. Down/Up
Converter
Adjustments
Reference
Related Performance
Test
Description
Equipment
Procedure
IF-Display Section
Down/Up Converter
Resolution Bandwidth Switching Uncertainty Test
The CAL OUTPUT signal is connected to the RF INPUT connector of
the instrument and controls are set to display the signal in a narrow
bandwidth. A marker is placed at the peak of the signal to measure
the peak amplitude. The bandwidth is changed to a wide bandwidth
and the Down/Up Converter is adjusted to place the peak amplitude
of the signal the same as the level of the narrow bandwidth signal.
Optionally, the input signal is removed and the IF signal is monitored
at the output of the Bandwidth Filters using a spectrum analyzer with
an active probe. The 18.4 MHz Local Oscillator and all harmonics are
then adjusted for minimum amplitude.
HP
HIGH FREOUENCY PROBE
SUPPLY
Figure 3-50. Down/Up Converter Adjustments Setup
Spectrum Analyzer . . . . . . . . . . . . . . . . . . . . . . . . . . . . HP
Active Probe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
HP
1. Position Instrument upright as shown in Figure 3-50 and remove
top cover.
2. Set LINE switch to ON and press
PRESET
].
3. Connect CAL OUTPUT to RF INPUT.
4.
Key in
[
CENTER FREQUENCY
)
20
MHz,
(
FREQUENCY SPAN
)
10
0
1
P
LIN pushbutton,
[
PEAK SEARCH
),
and then MARKER
5.
Key in
1 MHz.
3-92 Adjustments
Содержание 8568B
Страница 13: ...6 7 IF Section Bottom View 6 10 Contents 7 ...
Страница 19: ......
Страница 37: ......
Страница 42: ......
Страница 48: ......
Страница 53: ......
Страница 54: ...9 RF Gain Uncertainty Test h I 1 I I I Figure 2 16 RF Gain Uncertainty Measurement 2 32 Performance Tests ...
Страница 61: ......
Страница 90: ......
Страница 100: ...Test 9 RF Gain Uncertainty Test Step 6 2nd LO Shift Min Measured Max 1 0 dB 1 0 dB 2 78 Performance Tests ...
Страница 106: ...Test 13 Average Noise Level Test 2 84 Performance Tests ...
Страница 109: ...Test 16 Residual FM Test Test 16 Residual FM Test Step 14 Residual FM IMinIMeasuredIrax Performance Tests 2 87 ...
Страница 162: ......
Страница 224: ......
Страница 268: ......
Страница 270: ......
Страница 272: ......
Страница 278: ......
Страница 307: ...w43 c c5 c4 c3 c2 Figure 6 l RF Section Top View A26 6 4 Major Assembly and Component locations ...
Страница 312: ...AlVl Figure 6 6 IF Section Front View w3 w9 Major Assembly and Component locations 6 9 ...