
2. High-Voltage Adjustment (SN
and Below)
2. High-Voltage
Adjustment (SN
and Below)
Note
Note
Reference
Description
Warning
This procedure is for IF-Display Sections with serial number prefixes
and below. The procedure for serial prefixes
and above
is located immediately after this procedure.
This procedure should be performed whenever the
High
Voltage Multiplier,
CRT, or
High Voltage Regulator
Assembly is repaired or replaced.
IF-Display Section:
Z-Axis Amplifier
High-Voltage Regulator
V Regulator
+ 100 V,
V Regulator
This procedure is intended for adjustment purposes only.
Voltages are present which, if contacted, could cause serious
personal injury. Approximately -4000 V dc can be present on
the
High Voltage assembly even when the ac line cord is
disconnected. Do not attempt to remove the
High-Voltage
Assembly from the instrument. Do not disconnect the CRT’s
post-accelerator cable; the CRT can hold a + 18
dc charge for
several days.
If for any reason the
High Voltage Assembly or the
post accelerator cable must be removed, refer to “Discharge
Procedure for High Voltage and CRT” at the end of this
adjustment procedure.
A 1OOO:l divider probe is used to measure the CRT cathode voltage.
First, the high-voltage probe is calibrated by comparing measurements
of the + 100 V dc supply voltage with and without
the
probe. Any
measurement error due to the use of the high-voltage probe is
calculated into the adjustment specification of the CRT cathode
voltage, which is adjusted with the
HV ADJUST control. When
the CRT cathode voltage is properly adjusted, the CRT filament
voltage will be
V rms measured with CRT beam at
cut-off, which is required for maximum CRT life. The filament voltage
is referenced to the high-voltage cathode and can only be measured
directly with special equipment.
Adjustments 3-29
Содержание 8568B
Страница 13: ...6 7 IF Section Bottom View 6 10 Contents 7 ...
Страница 19: ......
Страница 37: ......
Страница 42: ......
Страница 48: ......
Страница 53: ......
Страница 54: ...9 RF Gain Uncertainty Test h I 1 I I I Figure 2 16 RF Gain Uncertainty Measurement 2 32 Performance Tests ...
Страница 61: ......
Страница 90: ......
Страница 100: ...Test 9 RF Gain Uncertainty Test Step 6 2nd LO Shift Min Measured Max 1 0 dB 1 0 dB 2 78 Performance Tests ...
Страница 106: ...Test 13 Average Noise Level Test 2 84 Performance Tests ...
Страница 109: ...Test 16 Residual FM Test Test 16 Residual FM Test Step 14 Residual FM IMinIMeasuredIrax Performance Tests 2 87 ...
Страница 162: ......
Страница 224: ......
Страница 268: ......
Страница 270: ......
Страница 272: ......
Страница 278: ......
Страница 307: ...w43 c c5 c4 c3 c2 Figure 6 l RF Section Top View A26 6 4 Major Assembly and Component locations ...
Страница 312: ...AlVl Figure 6 6 IF Section Front View w3 w9 Major Assembly and Component locations 6 9 ...