
Preventive Maintenance
Split/splitless capillary inlets
165
Leaks
For proper inlet operation, it is essential the entire system be leak•tight.
The following procedure should be performed in initial checkout, or any
time a leak is suspected.
1.
Switch off detector!
2. Install an inlet plug (a paper clip or similar•gaugewire) in the same
manner as a capillary column.
Capillary Inlet Plug Installed for Leak Test
Figure 8-5
3. Adjust the split•flowflow controller to about 60 ml/min.
4. Adjust or set the column head pressure to obtain a
column
pressure
of 138 kPa (20 psi).
gold
2
0
ENTER
Set inlet B pressure to 20 psi.
INJ B PRES
5. Shut off septum purge or cap the septum purge vent with a suitable
swagelok fitting. Verify that it is shut off with a soap film (bubble)
flow meter.
Содержание 5890 Series II
Страница 1: ...Reference Manual HP 5890 Series II and HP 5890 Series II Plus ...
Страница 8: ...This page intentionally left blank ...
Страница 9: ...1 Columns and Fittings ...
Страница 31: ...2 Keyboard and Displays ...
Страница 42: ...This page intentionally left blank ...
Страница 43: ...3 Temperature Control ...
Страница 57: ...4 Electronic Flow Sensing ...
Страница 66: ...This page intentionally left blank ...
Страница 67: ...5 Signal Output ...
Страница 98: ...This page intentionally left blank ...
Страница 99: ...6 Inlet Systems ...
Страница 123: ...7 Detector Systems ...
Страница 155: ...8 Preventive Maintenance ...
Страница 201: ...9 Chromatographic Troubleshooting ...
Страница 222: ...This page intentionally left blank ...
Страница 223: ...10 Test Sample Chromatograms ...
Страница 240: ...This page intentionally left blank ...