
Preventive Maintenance
Packed column inlet
161
4. Fully open the mass flow controller counterclockwise and wait 1 to
2 minutes to ensure equilibrium.
5. Turn off gas to the inlet at its source.
6. Wait 10 minutes while observing carrier source pressure. If it drops
less than 7 to 14 kPa (1 to 2 psi), the system (through the inlet
column fitting) is considered leak free.
Evidence of leakage requires the inlet system be leak•checked.
Repressurize the system as necessary, and
C
Use a suitable leak•detectionfluid to check for leakage fittings.
Correct or replace leaking fittings as needed.
Caution
Leak•detectionfluids often leave contaminating residues; after each
application, the area checked should be rinsed with CH
3
OH (methanol)
and allowed to dry.
C
After verifying fittings are leak•free,there are two locations at the
inlet itself where leakage may occur: at the septum, and at the
column connection.
-
The column connection is checked using a leak•detectionfluid.
-
The septum is checked with a bubble flow meter by pressing its
rubber inlet tube tightly onto the needle entrance in the septum
retainer nut or simply replacing the septum.
Содержание 5890 Series II
Страница 1: ...Reference Manual HP 5890 Series II and HP 5890 Series II Plus ...
Страница 8: ...This page intentionally left blank ...
Страница 9: ...1 Columns and Fittings ...
Страница 31: ...2 Keyboard and Displays ...
Страница 42: ...This page intentionally left blank ...
Страница 43: ...3 Temperature Control ...
Страница 57: ...4 Electronic Flow Sensing ...
Страница 66: ...This page intentionally left blank ...
Страница 67: ...5 Signal Output ...
Страница 98: ...This page intentionally left blank ...
Страница 99: ...6 Inlet Systems ...
Страница 123: ...7 Detector Systems ...
Страница 155: ...8 Preventive Maintenance ...
Страница 201: ...9 Chromatographic Troubleshooting ...
Страница 222: ...This page intentionally left blank ...
Страница 223: ...10 Test Sample Chromatograms ...
Страница 240: ...This page intentionally left blank ...