
52
3.2 Control unit Commander-
Box (C-Box)
With identical instructions:
The terminal has priority over the C-Box!
1
2
3
4
3.2.3 Filling (3)
Quit filling process: OFF
Start filling process: ON
More detailed information on filling can
be found in the enclosed instructions
from Co. Müller-Elektronik.
3.2.4 Outside cleaning (4)
Pressure switch for high pressure cleaner (optional)
3.3 Pressure gauge
Pressure gauges are arranged within the range
of vision of the driver to inform about the pres-
sures in the different areas:
5
6
7
(5) Spraying pump (before the pressure filter)
(6) Internal cleaning
(7) Agitator
¾
In case of an increased agitator/cleaning
pressure, nozzles may probably be blocked.
¾
In this case inspect the nozzles and clean
them if necessary.
Solution tank
Fresh water tank
OFF
= CLOSED
3.2.1 Suction side (1)
Fluid is drawn from the chosen container through
the spraying pump.
Five-way ball valve:
Fluid is pumped by the spraying pump into the
selected areas.
Spraying OFF / ON
injector induction hopper OFF / ON
Pressure ag / -
Internal cleaning OFF / ON
3.2.2 Pressure side (2)
Содержание Leeb 6 GS
Страница 4: ......
Страница 6: ......
Страница 38: ...38 2 2 Safety features and protections Boom rest for inside wings Folding lock Railing for working platform...
Страница 123: ...123 Fig 9 3 1a Fig 9 3 1 c Fig 9 3 1 d Fig 9 3 1 f Fig 9 3 1b Fig 9 3 1 e...
Страница 140: ...140 Diagram a with example...
Страница 147: ...147...
Страница 152: ......
Страница 153: ......