
121
Annually at start of season / 1000 operating hours
Component
maintenance work
workshop work
Flow meter
Calibrate the flow meter
nozzles
Perform volumetric measurement of the crop pro-
tection sprayer and check transverse distribution,
replace worn nozzles if necessary
brake drums
Check for dirt
X
Check the tapered bolts on the steering cylin-
der (Fig. 9.2 a), tightening torque 85 Nm
Brake
Automatic boom adjustment
- Function check
- Brake settings
X
PTO-shaft pump
Change the hydraulic oil, see 9.8.5
X
As required
Component
Maintenance work
Workshop work
folding boom
Correct the adjustments
X
Electric lighting
Replace defective light bulbs
Spraying pump
Replacement
X
Quarter annually / 200 operating hours
Component
maintenance work
workshop work
Brake
- Leak test
- Check pressure in compressed air vessel
- Check the brake cylinder pressure
- Brake cylinder safety check
- Joints on brake valves, brake cylinders and
brake linkages
- Brake adjustment on linkage actuator
- Inspection of brake linings
X
Wheels
- Wheel hubs - check bearing play
- Inspection of wheel nuts, tightening torque 510 Nm
X
line filters
Clean
Replace damaged filter elements
spring accumulator brake
Check braking effect in actuated state
Fig. 9.2 a
Содержание Leeb 6 GS
Страница 4: ......
Страница 6: ......
Страница 38: ...38 2 2 Safety features and protections Boom rest for inside wings Folding lock Railing for working platform...
Страница 123: ...123 Fig 9 3 1a Fig 9 3 1 c Fig 9 3 1 d Fig 9 3 1 f Fig 9 3 1b Fig 9 3 1 e...
Страница 140: ...140 Diagram a with example...
Страница 147: ...147...
Страница 152: ......
Страница 153: ......