80
Installation Instructions
Operator’s Manual
monty universal 2
1125.tif
i-1
ii-1
a
b
i. Installation requirements.
THE INSTALLATION SHALL BE CARRIED OUT ONLY
BY QUALIFIED PERSONNEL AND WITHIN THE
SCOPE OF THE INSTRUCTIONS PROVIDED IN THIS
MANUAL.
Install the machine in a covered and dry area.
Fig.i-1
The installation of the machine requires a free space
of at least 3x3 m (106"x106").
Make sure that from the operating position the user
can see all of the machine and the surrounding area.
The operator shall forbid, in such an area, the
presence of non authorized persons and of objects
which may create possible hazards.
WARNING
: THE OPERATOR IS RESPONSIBLE FOR
MACHINE OPERATION AND FOR RESTRICTING AC-
CESS TO THE WORK AREA.
WARNING:
ONLY THE OPERATOR MAY ACCESS
THE WORK AREA.
The machine shall be installed on a horizontal floor,
preferably even. Do not install the machine on a weak
or irregular floor.If the machine is installed on a raised
floor, the floor must have a capacity of at least 10000
N/m² (1000kg/m² or 205 lbsxsqft).
The device does not have to be fixed to the ground.
ii. Transport - Unpacking - Handling
the machine
Carriage instructions
The machine is crated in a corrugated box of appropriate
strength. The box is mounted on a pallet.
Handling of the machine must be made with an
appropriate lifting device (fork lift) (
a - Fig.ii-1
).
The machine can be alternatively mounted on the pallet
with the column assembled. In such a case the machine
must be anchored to the transportation vehicle with a
belt of appropriate strength rolled around the column
(
b - Fig.ii-1
).
Содержание monty UNIVERSAL 2
Страница 78: ...78 monty universal 2 ...
Страница 91: ...91 monty universal 2 Notes Blank Page for Blank Page pour Leere Seite für ...