2. Find the Front marking on the rails, and then orient the rails appropriately for
attaching to the SVP chassis.
3. Screw the internal racks onto the SVP chassis using the four large screws and the
two small screws.
4. Repeat steps 2 and 3 for the inner rail extension on the other side of the SVP
chassis.
Installing the outer rails to the rack
The outer rails that secure the physical SVP directly to the rack.
Procedure
1. Attach the short bracket to the outside of the long bracket.
You must align the pin with the slide.
2. Using the directions on the rails, orient the rails so that the front of the rail faces the
front of the rack. Adjust both the short rail and long rail to the proper distance, so
that they fit snugly into the rack. Then insert two small screws and two large M5
screws into the threaded holes in the slide area on the rails, as shown in the
following figure, to prevent the rails from moving.
3. Secure the long outer rail to the vertical rail at the front of the rack using a washer
and an M5 screw on one side of the rail and a safety nut on the other side. Then
connect the short outer rail to the vertical rail at the rear of the rack using another
washer and M5 screw.
Installing the outer rails to the rack
Chapter 4: Installing the Hitachi Vantara-supplied SVP