7.2 Test run procedure using the remote control switch (PC-ART)
Turn ON the power source of the units
Counting
number of
connected
units
Operation lamp
Procedure for TEST RUN mode of remote control switch.
Depress the MODE and the OK switches together for more
than 3 seconds.
a.
If TEST RUN and the counting number of the connected
units to the remote control switch (for example
05
) are
indicated on the remote control switch, the connection of
remote control cable is correct. → Go to
b.
If no indication appears or the number of the units indica-
ted is smaller than the actual number of the units, some
abnormalities exist. → Go to
Remote control
switch indication
Wrong portions
Inspection points after the power source OFF
No indication
The power source of outdoor unit is not
turned ON.
The connection of the remote control cable
is incorrect.
1
Connecting points of remote control cable, terminal board of
remote control switch and indoor unit.
2
Contact of terminals of remote control cable.
The connecting wires of power supply line
are incorrect or loosened.
3
Connection order of each terminal board.
4
Screw fastening of each terminal boards.
Counting number
of connected units
is incorrect
The power source of outdoor unit is not
turned ON.
The operating line wiring between indoor
unit and outdoor unit is not connected.
The connection of control cables between
each indoor units are incorrect. (When
one remote control switch controls multiple
units).
5
Dip switch setting on printed circuit board.
6
Connection on the PCB.
7
This is the same as item
1, 2, and 3.
Back to
after checking
Select TEST RUNNING MODE by depressing MODE Switch (COOL OR HEAT)
Depress RUN/STOP switch.
a.
The TEST RUN operation will be started. (The 2 hours OFF-TIMER will be set and the TEST RUN operation will be finished
after 2 hours unit operation or by depressing the RUN/STOP switch again).
N O T E
• TEST RUN operation ignores the temperature limitation and ambient temperature during heating operation to have
a continuous operation, but the protections are alive. Therefore, the protection may activate when the heating TEST
RUN operation is performed in high ambient temperature.
• TEST RUN operation time can be modifyed / increased depressing the time switch in the Remote Control.
b.
If the unit do not start or the operation lamp on the remote control switch is flickered, some abnormalities exist. →Go to
Содержание EV-1.5N1
Страница 2: ......
Страница 4: ... II ...
Страница 26: ......
Страница 100: ......
Страница 123: ...4 Electrical wiring 109 SMGB0079 rev 0 01 2013 4 4 7 2 RAS 3HVNPE 1 230V 50Hz U Surface V Surface W Surface XEK01261_0 ...
Страница 124: ...4 Electrical wiring 110 SMGB0079 rev 0 01 2013 4 7 3 RAS 4 6 HVNPE 1 230V 50Hz U Surface V Surface W Surface XEK01262_0 ...
Страница 128: ...4 Electrical wiring 114 SMGB0079 rev 0 01 2013 4 7 7 RAS 8 10 HN P C E 3N 400V 50Hz XEK01288_0 ...
Страница 129: ...4 Electrical wiring 115 SMGB0079 rev 0 01 2013 4 4 7 8 RAS 12HNP 3N 400V 50Hz Preliminary data 317S136064 ...
Страница 130: ...4 Electrical wiring 116 SMGB0079 rev 0 01 2013 4 7 9 RAS 12HNC 3N 400V 50Hz Preliminary data 317S136071 ...
Страница 144: ...5 Control System 130 SMGB0079 rev 0 01 2013 5 4 2 Dry operation Continues in the next page ...
Страница 148: ...5 Control System 134 SMGB0079 rev 0 01 2013 5 4 4 Automatic cooling and heating operation ...
Страница 158: ......
Страница 196: ......
Страница 212: ...8 Troubleshooting 198 SMGB0079 rev 0 01 2013 ...
Страница 215: ...8 Troubleshooting 201 SMGB0079 rev 0 01 2013 8 ...
Страница 323: ...9 Spare parts 309 SMGB0079 rev 0 01 2013 9 RAS 8 10 HNCE Spare Parts Document EPN 201211B ...
Страница 324: ...9 Spare parts 310 SMGB0079 rev 0 01 2013 9 6 2 Electrical parts Spare Parts Document EPN 201211B ...
Страница 332: ......
Страница 452: ......
Страница 479: ......