Page 64
5.4.2 Drain and Exhaust Connections
The BioTector should be installed in a well-ventilated area with the exhaust port
piped to an external vent. The installation should be carried out in accordance
with
All BioTector drain tubing must be positioned correctly so that any liquid pumped will drip freely into a larger
drain chamber. The correct positioning and setup of the drain ports prevent liquid accumulation and
measurement errors. All drain ports should be directed to a well ventilated area as oxygen and other gases
may be released during the analysis. The drain tubes should be at atmospheric pressure and should not be
subjected to any back pressure as this may result in measurement errors. The exhaust tube should be piped
out to a well ventilated area as oxygen and other gases will be released during the analysis. The end of this
tube should be positioned in a downward position so that water condensation and freezing will not occur
during winter months. Figure 16 illustrates BioTector connections including the Sample, Manual grab sample,
Sample Out (drain) and the Exhaust connections.
Figure 16 BioTector drain and exhaust connections
WARNING
Содержание BioTector B3500C
Страница 17: ...Page 17 Software Menu Diagram...
Страница 44: ...Page 44 Figure 4 BioTector analysis layout typical TIC TOC system...
Страница 46: ...Page 46 Figure 6 BioTector oxygen concentrator layout...
Страница 63: ...Page 63...
Страница 78: ...Page 78 Section 8 Maintenance Menu Maintenance Menu Diagram...
Страница 155: ...Page 155 Section 11 System Replacement and Spare Parts...
Страница 163: ...Page 163 ZK Zero check ZM Manually input zero adjust ZS Zero and Span...