Page 54
Figure 9 Mains and 4-20mA terminal diagram for 115 / 230 V systems
The wiring and earth connections to the analyzer should be carried out in accordance with local regulations,
and securely terminated in the phase, neutral and earth terminals in the BioTector. Cable glands must be
used to secure the cables when necessary.
All electrical, sample, reagent, drain and exhaust connections should be carried out
in accordance with the technical specifications and drawings given in this manual.
Errors as a result of non-conformity to these specifications will not be covered by the
warranty.
Содержание BioTector B3500C
Страница 17: ...Page 17 Software Menu Diagram...
Страница 44: ...Page 44 Figure 4 BioTector analysis layout typical TIC TOC system...
Страница 46: ...Page 46 Figure 6 BioTector oxygen concentrator layout...
Страница 63: ...Page 63...
Страница 78: ...Page 78 Section 8 Maintenance Menu Maintenance Menu Diagram...
Страница 155: ...Page 155 Section 11 System Replacement and Spare Parts...
Страница 163: ...Page 163 ZK Zero check ZM Manually input zero adjust ZS Zero and Span...