158
Index
A C D E F G H I L M N O P Q R S T V W
A
AC power cords,
Accessing the switch for the first time,
Affixing labels,
Air filters,
Attaching an ESD wrist strap,
C
Cable management guidelines,
Chassis LEDs (S12510-X AC/S12510-X DC switch),
Chassis views,
Configuration terminal problems,
Configuring basic IRF settings,
Configuring the switch,
Confirming installation preparations,
Connecting the physical IRF ports,
Connecting the switch to the network,
Console cable,
CXP fiber cable,
D
DC input terminal blocks,
DC power cords,
E
Environmental specifications,
Ethernet twisted pair cable,
Examining the installation site,
Examples,
F
Fan failure,
Fan tray status LEDs,
Fan trays,
Filling in labels,
G
General cabling requirements,
Grounding the switch,
Guidelines,
H
Heat dissipation,
I
Installing accessory kits,
Installing cards,
Installing IRF member switches,
Installing power modules,
Installing the switch in a rack,
Installing transceiver modules,
Interface failure,
IRF fabric setup flowchart,
L
Labels for cables,
Labels for devices,
LPU and switching fabric module failure,
LPU LEDs,
LPUs,
M
Module power consumption and system power
consumption,
MPU failure,
MPU LEDs,
MPUs,
N
Noise,
O
Optical fiber,
P
Planning IRF fabric setup,
Power module LEDs,
Power modules,
Power supply system failure,
Prerequisites,
Q
Содержание S12500-X
Страница 35: ...26 Figure 20 Grounding the switch through the RTN wire of the DC power module...
Страница 80: ...71 Figure 51 Replacing an LPU 1 1 Loosen the captive screw 2 Pull the ejector levers outward...
Страница 138: ...129 Figure 75 CXP fiber cable 1 Connector 2 Pull latch 1 2...
Страница 152: ...143 Figure 91 Cable routing from the left side for an S12510 X AC S12510 X DC switch...