8
Installing the switch
IMPORTANT:
Keep the packages of the switch and the components for future use.
Confirming installation preparations
Before you install an S12500-X switch, verify that:
•
You have read "
" carefully and the installation site meets all the
requirements.
•
A 19-inch rack is ready for use and the rack has enough space to accommodate the switch . For
information about how to install a rack, see the rack installation guide.
•
The rack is sturdy and securely grounded.
•
No debris exists inside or around the rack.
•
The heaviest device is placed at the bottom of the rack.
•
The rack power supplying capabilities meet the device requirements. For information about the
system and module power consumptions, see "
Appendix A Chassis views and technical
." For power module specifications, see "
Appendix B FRUs and compatibility
•
The total height of the switches to be installed is no higher than the available installation height of
the rack and enough clearance is reserved for cable routing.
•
The switch is ready for installation and has been carried to a place near the rack and convenient for
moving.
Installing accessory kits
Accessory kits
Table 6
Accessory kits for the S12500-X Switch Series
Accessory kit
Description
Mounting bracket
•
Used to secure the chassis to a rack.
•
Mounted to the chassis before shipment.
•
Located at the two sides of the chassis.
•
Appearance varies by switch models.
{
S12510-X AC and S12510-X DC
—
Independent mounting brackets.
(See callout 1 in
.)
{
S12516-X AC and S12516-X DC
—
Mounting brackets are attached with
a cable management bracket.
Содержание S12500-X
Страница 35: ...26 Figure 20 Grounding the switch through the RTN wire of the DC power module...
Страница 80: ...71 Figure 51 Replacing an LPU 1 1 Loosen the captive screw 2 Pull the ejector levers outward...
Страница 138: ...129 Figure 75 CXP fiber cable 1 Connector 2 Pull latch 1 2...
Страница 152: ...143 Figure 91 Cable routing from the left side for an S12510 X AC S12510 X DC switch...