144
Figure 92
Cable routing from both sides for an S12510-X AC/S12510-X DC switch
Routing network cables for an S12516-X AC/S12516-X DC
switch
The cable management brackets are installed at the both sides of an S12516-X AC/S12516-X DC switch.
As a best practice, route network cables from both sides, as shown in
.
Содержание S12500-X
Страница 35: ...26 Figure 20 Grounding the switch through the RTN wire of the DC power module...
Страница 80: ...71 Figure 51 Replacing an LPU 1 1 Loosen the captive screw 2 Pull the ejector levers outward...
Страница 138: ...129 Figure 75 CXP fiber cable 1 Connector 2 Pull latch 1 2...
Страница 152: ...143 Figure 91 Cable routing from the left side for an S12510 X AC S12510 X DC switch...