Model G0634Z/G0634XP (Mfd. Since 01/20)
-27-
Tighten V-Belts
The final step in the setup process must be done
after approximately 16 hours of operation. During
this first 16 hours, the V-belts will stretch and seat
into the pulley grooves. After this 16 hours, you
must re-tension the V-belts to avoid slippage and
burn out. Refer to
Page 48
when you are ready to
perform this important adjustment.
Note: Pulleys and belts can get hot. This is a nor-
mal condition. Allow them to cool before making
adjustments.
A small amount of black belt dust at the bottom
of the belt housing is normal during the life of the
machine and does not indicate premature belt
failure is in progress.
For your convenience, the adjustments listed
below have been performed at the factory and no
further setup is required to operate your machine.
However, because of the many variables involved
with shipping and storage, some of these adjust-
ments may need to be repeated to ensure opti-
mum cutting results. Keep this in mind as you
start to use your new jointer/planer.
Step-by-step instructions for these adjust-
ments can be found in SECTION 7: SERVICE
ADJUSTMENTS.
1.
Jointer Table Parallelism (
Page 51
)
2.
Depth Scale Calibration (
Page 56
)
3.
Fence Stop Accuracy (
Page 56
)
4.
Planer Table Parallelism (
Page 54
)
5.
Feed Roller Spring Tension (
Page 60
)
Recommended
Adjustments
Содержание G0634Z insert
Страница 92: ......