Chapter V GW4D20 / GW4D20B Turbocharged Diesel Engine
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
347
Fig. 5-19-2 Removing the earthing cable of
storage battery
Fig. 5-19-3 Removing the transmission
assembly
Fig. 5-19-4 Removing the engine assembly
Removal
Preparation
(1) Disconnect the grounding cable of storage battery.
See Fig. 5-19-2.
(2) Drain the cooling system of coolant.
(3) Drain out the engine oil (lubricating oil) in the
lubrication system.
(4) Lift the vehicle to an appropriate height and support
it with a safety rack.
Warning:
hot oil (lubricating oil) may cause burn,
handle the used oil properly and protect the
environment.
Removing the transmission assembly
①
(1) Remove the drive shaft at the flange yoke.
(2) Remove the transmission assembly.
——Remove the rotation speed sensor connector.
——Remove the bolts connecting the transmission and
clutch in proper order, and remove the transmission
assembly. See Fig.5-19-3.
Removing the engine assembly
②
.
(1) Remove the nuts fastening the engine bracket:
loosen the 2 fixing nuts that connect the engine left /
right bracket and the frame studs so as to separate the
engine from the frame.
(2) Remove the generator belt, the refrigerating
compressor and the power steering pump.
(3) Remove the catalyst pipe.
(4) Connect the hook to the crane to lift the engine
carefully, as shown in Fig. 5-19-4.
(5) After being raised, the head of the engine should be
higher than the tail.
(6) Place the engine steady on the maintenance rack for
repair, removal and reinstallation.
Attention:
When removing the engine assembly,
do not damage the oil pipe, the brake pipe, the sensor
or electric elements, etc.
Transmission
Clutch assembly
Engine hook