MAINTENANCE MANUAL OF GW4D20/GW4D20B TURBOCHARGED DIESEL ENGINES
234
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
Fig. 5-3-26 Installing the clutch pressure plate
assembly
Fig. 5-3-27 Installing the transmission and the
clutch assembly
Fig. 5-3-28 Connecting the earthing cable of
storage battery
(2) Pressure plate assembly
——Tighten 9 bolts that fix the clutch pressure plate
assembly to specified torques in proper order as shown
in Fig. 5-3-26.
Tightening torques for fixing bolts of clutch
pressure plate assembly
23N·
m±3N·
m
——Remove the guide centering device.
Attention:
If a new pressure plate is installed, the
wire for protecting the diaphragm spring must be
removed after the fixing bolts of the pressure plate are
tightened to specified torques.
(3) Transmission assembly
——Fit the 2 transmission dowel pins into the back end
face of the cylinder body by a special tool; there should
be no deflection or improper mounting.
——Install the transmission assembly. Screw down the
fastening bolts connecting the transmission and clutch
in proper order and as per specified torque. See Fig.
5-3-27.
——Install the drive shaft.
After the installation, please carry out the following
operations.
(1) Connect the earthing cable of storage battery. See
Fig. 5-3-28.
(2) Fill coolant into the cooling system.
(3) Fill the lubricating oil into the transmission.
Start the engine, check its working condition and check
the cooling system for leakage.
Transmission
Clutch assembly