MAINTENANCE MANUAL OF GW4D20/GW4D20B TURBOCHARGED DIESEL ENGINES
244
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
Fig. 5-5-11 Installing the air intake pipe of
EGR condenser
Fig. 5-5-12 Installing the turbocharger heat
shield and turbocharger
Fig. 5-5-13 Installing the turbocharger fuel
inlet bolt
23N·
m±3N·
m
Installing the turbocharger assembly
④
(1) Install the turbocharger gasket and turbocharger and
tighten the connecting bolt and 2 fastening nuts
according to the specified torque. See Fig. 5-5-12.
Tightening torque for fastening bolt and nut of
turbocharger
45N·
m±3N·
m
(2) Install the turbocharger heat shield and tighten the 3
hexagon flange bolts (M6×12) according to the
specified torque.
Tightening torque for fastening bolt of turbocharger
heat shield
9N·
m±3N·
m
(3) Install the fuel inlet pipe of turbocharger and fuel
inlet bolt connecting the turbocharger and tighten it
according to the required torque.
Tightening torque for turbocharger fuel inlet bolt
22N·
m±3N·
m
(4) Install the turbocharger fuel return hose component
and tighten the 2 hexagon flange bolts (M6×16)
according to the specified torque.
Tightening torque for fastening bolt of turbocharger
heat shield
9N·
m±3N·
m
(5) Connect the turbocharger harness plug.
Installing the turbocharger fuel inlet bolt
③
Install the fuel inlet bolt and gasket at turbocharger and
tighten it according to the specified torque. See Fig.
5-5-13.
condenser
Air intake pipe of
condenser
Heat shield
Fuel return
hose
Turbocharger
Fuel inlet bolt
Fuel inlet pipe
assembly