Chapter XI Electrical System
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
471
Fig. 11-2-6 Removing the engine assembly
Removing the engine assembly
③
(1) Remove the 2 hexagon flange bolts (M10×115)
at the rear end of air intake side of the cylinder
body (the bolts are used for fastening the starter).
See Fig. 11-2-6.
(2) Take out the starter from the starter mounting
hole at the rear end of the cylinder body.
Fig. 11-2-7 Reinstalling the starter assembly
Reinstallation
Reinstalling the starter assembly
③
(1) After installing the transmission, install the
starter assembly into the mounting hole at the rear
end of the cylinder body. The rabbet of the starter
should be accurate.
(2) Install the 2 hexagon flange bolts (M10×115)
fastening the starter to the cylinder body, and
tighten them according to specified torque. See
Fig. 11-2-7.
Tightening torque for the fastening bolt of the
starter
50 N • m± 3 N • m
Fig. 11-2-8 Reinstalling the starter assembly
Reinstalling the harness plug
②
Hold the starter harness plug, and insert the
harness connectors into it. See Fig. 11-2-8.
Reinstalling the terminal
①
Connect the terminal of earthing cable for storage
battery with the terminal of starting switch wire,
and then tighten the fastening nut according to
specified torque.
Tightening torques for the fastening bolt of the
terminals
23 N • m± 3 N • m
Cylinder body
Starter