Chapter V GW4D20 / GW4D20B Turbocharged Diesel Engine
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
315
Fig. 5-14-14 Installing the timing hood
component
Fig. 5-14-15 Installing the damping pulley
assembly
Fig. 5-14-16 Installing the generator bracket
and the generator
(7) Install the timing hood, and tighten the 5 hexagon
flange bolts (M10×35, M10×50) with specified torques
after aligning the mounting holes.
Tightening torque of fastening bolt of timing hood
45N·
m±3N·
m
——Fit the timing hoods
Ⅰ
and
Ⅱ
, and screw the 10
hexagon flange bolts (M6×6) with specified torques after
aligning the mounting holes. See Fig. 5-14-14.
Tightening torque of fastening bolt of timing hoods
Ⅰ
and
Ⅱ
.
9N·
m±3N·
m
Installing the damping pulley
②
.
(1) Install the elastic cylindrical pin into the pin hole of
crankshaft timing belt pulley.
(2) Install the damping pulley to the front end of
crankshaft, and screw the 4 hexagon flange bolts
(M8×20) to the timing pulley of crankshaft with specified
torques. See Fig. 5-14-15.
Tightening torque of fastening bolt of damping
pulley
23N·
m±3N·
m
Attention:
The timing mark must face forwards
after the installation.
Installing the engine accessories
①
.
(1) Install the generator bracket to the front end of the
exhaust side of cylinder body and screw the 3 hexagon
flange bolts (M8×30, M8×25) with specified torques.
Install the generator assembly, and screw the 3
hexagon flange bolts (M10×45, M8×30) with specified
torques. See Fig. 5-14-16.
Tightening torques for fastening bolts of generator
bracket and generator
M8
23N·
m±3N·
m
M10
45N·
m±3N·
m
Crankshaft
Timing pulley
Damping pulley