MAINTENANCE MANUAL OF GW4D20/GW4D20B TURBOCHARGED DIESEL ENGINES
330
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
Fig. 5-16-19 Installing the piston connecting
rod assembly
Fig. 5-16-20 Installing the connecting rod
cover
Fig. 5-16-21 Installing the upper body
assembly of oil pan
Clearance between connecting rod big end and
crankshaft crank
0.22~0.37mm
Installing the oil pan upper and lower body
assemblies and oil collector assembly
⑤
(1) Check whether the dowel pin of the oil pan upper
body is installed correctly. Apply silastic plane sealant to
the junction surface between the oil pan and cylinder
body evenly and then install the oil pan upper body onto
the cylinder body.
LOCTITE587 plane sealant
Attention:
Make sure the junction surface between
the upper body of oil pan and the cylinder body is clean
before reapplying sealant.
(2) Tighten the 15 hexagon flange face bolts (M8×25,
M6×20, M6×110 and M8×45) connecting the oil pan
upper body and the lower cylinder body to the specified
torque in order. See Fig. 5-16-21. The junction surfaces
should cling to each other tightly after installation.
Tightening torque for the fastening bolt of oil pan
upper body
M6
9N·
m±3N·
m
M8
23N·
m±3N·
m
(3) After applying an appropriate amount of lubricating
oil to the seals of the oil collector, align the oil suction
holes of the oil pan and fit the oil collector gasket. Later,
screw in the 2 hexagon flange face bolts (M8×16) and
tighten them to the specified torque. See Fig. 5-16-22.
Mobil API CI-4 lubricating oil
Attention:
Install and fix the 2 hexagon flange face
bolts (M6×12) for fixing the oil collector bracket after
installing the oil pan upper body. See Fig. 5-16-22.
Tightening torque for the fastening bolt of oil
collector
M6
9N·
m±3N·
m
M8
23N·
m±3N·
m
Front
side
Connecting
rod cover
Connecting
rod bolt
Cylinder body
Upper body of
oil pan