Chapter V GW4D20 / GW4D20B Turbocharged Diesel Engine
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
375
Fig. 5-20-30 Installing the oil pump assembly
Fig. 5-20-31 Installing the upper body of oil
pan
Fig. 5-20-32 Installing the upper body of oil
pan
(4) Install the oil pump assembly and the cylinder body
together and tighten in order the 10 hexagon bolts and
the plain washer components (M8×40, M8×25, M8×20)
with the required torque. See Fig. 5-20-30.
Tightening torque for fastening bolt of oil pump
23N·
m±3N·
m
There should be no stagnation when the oil pump
pulley is rotating after installation.
Installing the oil pan lower body assembly, oil
collector assembly and oil pan upper body
assembly
⑩
(1) Check the installation of the dowel pin on the oil pan
upper body for correctness, apply the silicon rubber flat
sealant evenly to the junction surfaces of the oil pan and
the cylinder body and install the oil pan upper body to
the cylinder body.
LOCTITE587 flat sealant.
Attention:
make sure the joint surface between the
upper body of oil pan and the cylinder body is clean
before reapplying glue.
(2) Screw down the 15 hexagon flange bolts (M8×25,
M8×45, M6×20, M6×110) on the oil pan upper body and
the lower cylinder body in order with required torque.
See Fig. 5-20-31. The junction surfaces shall connect
tightly.
Tightening torque for fastening bolt of the oil pan
upper body
M6
9N·
m±3N·
m
M8
23N·
m±3N·
m
(3) After applying an appropriate amount of lubricating
oil to the sealing position of the oil collector, align the oil
suction holes of the oil pan and meanwhile put in an oil
collector gasket and tighten it with 2 hexagon flange
bolts (M6×16). See Fig. 5-19-32.
Tightening torque for fastening bolt of oil collector
M6
9N·
m±3N·
m
M8
23N·
m±3N·
m
Attention:
install and fix 2 hexagon flange face
bolts (M8×12) on the fixing oil collector bracket after
installing oil pan upper body.
Mobil API CI-4 lubricating oil
Outer rotor
Seal ring
Front oil seal
oil pan upper
body
Oil collector
assembly