Frame Installation
20
GV K-Frame XP Video Processor Door Removal Clearance
Consider future options—The total AC power consumption is significantly influenced by the
number and type of hardware options installed. This includes the number of boards: M/Es,
I/Os, and Modular I/Os.
GV K-Frame XP Video Processor Door Removal Clearance
The GV K-Frame XP Video Processor door on all Frames can be completely removed when
installed in a rack immediately below conventional flush mounted rack-ear only
equipment. Mounting any GV K-Frame XP in a rack immediately below other equipment
that extends forward from the rack (for example, under another GV K-Frame XP chassis)
may not provide enough clearance to remove the door.
If mounted below equipment that extends forward from the rack, allow at least 24 mm
(0.94 in.) of vertical clearance above the GV K-Frame XP to permit door removal. A flush
design 1 RU blank filler panel can be used for clearance, if required.
Replacing Compact Power Supplies
GV K-Frame XP Video Processors come with two power supplies with the option of a third,
located in the front of the chassis. Power supplies are hot swappable in systems containing
two or more power supplies.
1
To remove the power supply.
a
Open the front door of the Frame.
CAUTION: The Video Processor front door must remain in place and
closed during normal system operation to maintain
maximum cooling efficiency.
CAUTION: ESD equipment and procedures should be used when
servicing electronic components.
Содержание KARRERA
Страница 47: ...Installation Service Manual 23 15 RU Dimensions Side View ...
Страница 49: ...Installation Service Manual 25 15RUVideo Processor Views 15 RU Front View withDoor Removed ...
Страница 50: ...Frame Installation 26 15 RU Rear ViewIP Gearbox Conversion 15RU Front View withDoor Removed ...
Страница 52: ...Frame Installation 28 PowerSupplyFrameDimensions TopView ...
Страница 126: ...System Cabling GPI In GPI Out Relay Tally Pin Assignments 102 D 37Female Pin 1 Pin19 Pin 20 Pin 37 Socket Pinout ...
Страница 171: ...Installation Service Manual 147 ...
Страница 204: ...Basic Configuration 180 ...
Страница 208: ...Basic Configuration 184 green ...
Страница 234: ...Basic Configuration 210 ...
Страница 265: ...Installation Service Manual 241 ...
Страница 296: ...External Interfaces 272 PBus and GPI Enables ...
Страница 304: ...External Interfaces 280 About Editor Ports 6 Select the Map Sources button and configure the Switcher Sources ...
Страница 337: ...Installation Service Manual 313 8804_33 Karrera3 ME Panel Open Air Guide Removed Transition Input Board Board Power ...
Страница 366: ...Maintenance 342 ...
Страница 367: ...Installation Service Manual 343 ...
Страница 368: ...Maintenance 344 ...