Installation & Service Manual
327
12.X to 14.3 Upgrade: Install IP Board ARM Software
Result:
HAD Flashing Success! 8 Passed, 0 failed
6
Once the programming is completely finished, power cycle the Frame to complete the
HAD update process.
7
To verify the update, enter checkHADs at the prompt:
->checkHADs
Result:
HADs up-to-date:
value = 1 = 0x1
HADs out-of-date:
value = 0 = 0x0
(followed by a list of out-of-date HADs)
-> checkHADs
value = 1= 0x1
->
12.X to 14.3 Upgrade: Install IP Board ARM Software
GV K-Frame XP IP systems with switcher software version 12.x.x require an upgrade to the
latest IP I/O Board ARM software when installing 14.3.x software. Upgrade the ARM
software using either a serial connection or SSH session.
NOTE: The default username for an SSH connection is “user” and the default
password is “gvuser”.
Note: Starting with switcher software version 14.0.0, Board ARM
Software upgrades for IP I/O boards are no longer required; the
process has been automated.
1
Using the GV K-Frame XP Installer, install the 14.3.1 software (see the
Kayenne/Karrera/GV Korona
Release Notes
for specific instructions).
2
Open the Frame door and attach the serial console cable to the front edge of the
Controller board. Upgrade or Verify that the board FPGA HADs are up to date.
3
To check the HAD status, enter checkHADs at the prompt:
->checkHADs
Result:
HADs up-to-date:
value = 1 = 0x1
HADs out-of-date:
value = 0 = 0x0
1
If the HADs are out of date, continue to the next steps.
2
Enter the console menu by typing consoleMenu at the prompt:
CAUTION: Do not power down or reset the Frame during the update
process, HAD programming takes several minutes to
complete.
Содержание KARRERA
Страница 47: ...Installation Service Manual 23 15 RU Dimensions Side View ...
Страница 49: ...Installation Service Manual 25 15RUVideo Processor Views 15 RU Front View withDoor Removed ...
Страница 50: ...Frame Installation 26 15 RU Rear ViewIP Gearbox Conversion 15RU Front View withDoor Removed ...
Страница 52: ...Frame Installation 28 PowerSupplyFrameDimensions TopView ...
Страница 126: ...System Cabling GPI In GPI Out Relay Tally Pin Assignments 102 D 37Female Pin 1 Pin19 Pin 20 Pin 37 Socket Pinout ...
Страница 171: ...Installation Service Manual 147 ...
Страница 204: ...Basic Configuration 180 ...
Страница 208: ...Basic Configuration 184 green ...
Страница 234: ...Basic Configuration 210 ...
Страница 265: ...Installation Service Manual 241 ...
Страница 296: ...External Interfaces 272 PBus and GPI Enables ...
Страница 304: ...External Interfaces 280 About Editor Ports 6 Select the Map Sources button and configure the Switcher Sources ...
Страница 337: ...Installation Service Manual 313 8804_33 Karrera3 ME Panel Open Air Guide Removed Transition Input Board Board Power ...
Страница 366: ...Maintenance 342 ...
Страница 367: ...Installation Service Manual 343 ...
Страница 368: ...Maintenance 344 ...