SETTING TO WORK
C-1
Gendex Dental Systems
ORALIX AC SYSTEM
SECTION C
SETTING TO WORK
1.
INTRODUCTION ................................................................................................ C-1
2.
TOOLS AND INSTRUMENTS REQUIRED ....................................................... C-1
3.
CONTROLS, INDICATORS AND JUMPERS SETUP ....................................... C-2
3.1.
JUMPERS AND DIP-SWITCHES SETUP ...................................................................................... C-2
4.
MECHANICAL FUNCTIONING ......................................................................... C-3
4.1.
FOLDING ARM ............................................................................................................................ C-3
4.2.
TUBEHEAD .................................................................................................................................. C-3
4.3.
EXTENSION ARM ........................................................................................................................ C-3
4.4.
MOBILE STAND ADJUSTMENTS .................................................................................................. C-3
5.
ELECTRICAL CHECKS .................................................................................... C-4
5.1.
CHECK OF THE MAINS VOLTAGE MEASURING CIRCUIT .......................................................... C-4
5.2.
TEST AND DIAGNOSTIC ROUTINE: DENSOMAT ......................................................................... C-4
5.2.1. Test of LEDs/Keys and Display functionality (Test mode routine) ........................................ C-4
5.2.2. Tubehead Voltage Select routine ......................................................................................... C-5
5.2.3. Measurement of mains voltage (DVM routine) ..................................................................... C-5
5.2.4. Exposure Counter routine .................................................................................................... C-5
5.3.
TEST AND DIAGNOSTIC ROUTINE: SECONDENT ....................................................................... C-6
5.3.1. Test of LEDs functionality (Test mode routine) ..................................................................... C-6
5.3.2. Measure of mains voltage (DVM routine) ............................................................................. C-6
5.4.
TUBEHEAD VERSION SELECTION ............................................................................................. C-7
6.
FUNCTIONAL TEST ......................................................................................... C-7
6.1.
FUNCTIONAL TEST ON TIMER SECONDENT .............................................................................. C-7
6.2.
FUNCTIONAL TEST ON TIMER DENSOMAT ................................................................................ C-8
DRAWINGS:
CONTROLS AND INDICATORS ON TIMER DENSOMAT ...................................................................... CZ-1
CONTROLS AND INDICATORS ON TIMER SECONDENT .................................................................... CZ-2
1. INTRODUCTION
This section contains detailed information about adjustment and test procedures for the setting up of the Oralix
AC system.
2. TOOLS AND INSTRUMENTS REQUIRED
For the setting of the Oralix AC system, the following are required:
-
standard service tools;
-
digital voltmeter. (Accuracy =/< 1%)
Printed on: 22 Mär 2012, 09:28:10 am; Printed by: TOBIAS BAUER