Gendex Dental Systems
E-2
4519-190-70943_4
ORALIX AC SYSTEM
PREVENTIVE MAINTENANCE
1. INTRODUCTION
These instructions describe the preventive maintenance actions to be carried out on the Oralix AC dental
systems to ensure operational security and efficiency.
The actions mentioned in these instructions are based upon recommendations given BRH, IEC, and the other
standard which the system complies with.
Where necessary the actions should be adpted to the local standards.
It is responsability of the User to maintain the equipment efficient and in compliance with the standards by
following the manufacturer's recommended maintenance schedule.
Failure of the User to properly maintain the equipment relieves the manufacturer, or his agent, from all
responsability for the non compliance which may result.
It is to be recommended that preventive maintenance be carried out either by Gendex specialists, or by others
especially trained by Gendex to do this job.
2. PRELIMINARY
2.1.
INSPECTION CYCLE
The suggested frequency is 24 months for each inspection of the Oralix system. One man is needed for the
execution of the preventive maintenance inspection.
2.2.
EQUIPMENT REQUIRED
Digital DC voltmeter.
Standard service toolkit.
Dosemeter.
Special pushing drift code 4519 190 00871 (Option).
Bonding tester.
2.3.
CLEANING MATERIALS AND LUBRICANTS
Dry woollen cloth.
Soft long haired brush for removing dust.
Brush for applying grease.
White grease Molikote Longterm W2.
3. PREVENTIVE MAINTENANCE CHECKLIST
The preventive maintenance checklist is given at the end of this section to provide recording of all the useful
data from each inspection.
The space on top of the first page is available for stating the customer data.
The column R/S enables remarking of actions concerning safety (S) or/and actions involving use of radiation
(R).
The column ACTIONS contains the individual that must be carried out in sequential order.
Refer to paragraph 4.n for the procedure corresponding to the test n.
The columns INSPECTION are provided to record the measured values for each inspection: data in these
columns indicate that the corrisponding action has been carried out.
Printed on: 22 Mär 2012, 09:28:10 am; Printed by: TOBIAS BAUER