7-10
G60 Generator Protection System
GE Multilin
7.2 TARGETS
7 COMMANDS AND TARGETS
7
•
How often the test is performed
: Event driven. The test is performed when a device programmed to receive GOOSE
messages stops receiving. This can be from 1 to 60 seconds, depending on GOOSE packets.
•
What to do
: Check GOOSE setup.
•
Latched target message
: Yes.
•
Description of problem
: The ambient temperature is greater than the maximum operating temperature (+80°C).
•
How often the test is performed
: Every hour.
•
What to do
: Remove the G60 from service and install in a location that meets operating temperature standards.
•
Latched target message
: Yes.
•
Description of problem
: Abnormal restart from modules being removed or inserted while the G60 is powered-up, when
there is an abnormal DC supply, or as a result of internal relay failure.
•
How often the test is performed
: Event driven.
•
What to do
: Contact the factory.
TEMP MONITOR:
OVER TEMPERATURE
UNEXPECTED RESTART:
Press “RESET” key
Содержание G60 UR Series
Страница 2: ......
Страница 4: ......
Страница 12: ...xii G60 Generator Protection System GE Multilin TABLE OF CONTENTS ...
Страница 32: ...1 20 G60 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 102: ...3 48 G60 Generator Protection System GE Multilin 3 4 MANAGED ETHERNET SWITCH MODULES 3 HARDWARE 3 ...
Страница 132: ...4 30 G60 Generator Protection System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 392: ...5 260 G60 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 418: ...6 26 G60 Generator Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Страница 446: ...8 18 G60 Generator Protection System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 452: ...9 6 G60 Generator Protection System GE Multilin 9 1 PHASE DISTANCE THROUGH POWER TRANSFORMERS 9 THEORY OF OPERATION 9 ...
Страница 482: ...A 12 G60 Generator Protection System GE Multilin A 1 PARAMETER LISTS APPENDIXA A ...
Страница 604: ...D 10 G60 Generator Protection System GE Multilin D 1 IEC 60870 5 104 APPENDIXD D ...
Страница 616: ...E 12 G60 Generator Protection System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...
Страница 634: ...x G60 Generator Protection System GE Multilin INDEX ...