5-60
G60 Generator Protection System
GE Multilin
5.2 PRODUCT SETUP
5 SETTINGS
5
EXAMPLE 3: PILOT-AIDED SCHEMES
Consider the three-terminal line protection application shown below:
Figure 5–14: THREE-TERMINAL LINE APPLICATION
A permissive pilot-aided scheme could be implemented in a two-ring configuration as shown below (IEDs 1 and 2 constitute
a first ring, while IEDs 2 and 3 constitute a second ring):
Figure 5–15: SINGLE-CHANNEL OPEN LOOP CONFIGURATION
In the above application, the following settings should be applied. For UR-series IED 1:
DIRECT OUTPUT DEVICE ID:
“1”
DIRECT I/O CH1 RING CONFIGURATION:
“Yes”
DIRECT I/O CH2 RING CONFIGURATION:
“Yes”
For UR-series IED 2:
DIRECT OUTPUT DEVICE ID:
“1”
DIRECT I/O CH1 RING CONFIGURATION:
“Yes”
DIRECT I/O CH2 RING CONFIGURATION:
“Yes”
For UR-series IED 3:
DIRECT OUTPUT DEVICE ID:
“1”
DIRECT I/O CH1 RING CONFIGURATION:
“Yes”
DIRECT I/O CH2 RING CONFIGURATION:
“Yes”
In this configuration the following delivery times are expected (at 128 kbps):
IED 1 to IED 2: 0.2 of power system cycle;
IED 1 to IED 3: 0.5 of power system cycle;
IED 2 to IED 3: 0.2 of power system cycle.
In the above scheme, IEDs 1 and 3 do not communicate directly. IED 2 must be configured to forward the messages as
explained in the
Inputs and outputs
section. A blocking pilot-aided scheme should be implemented with more security and,
ideally, faster message delivery time. This could be accomplished using a dual-ring configuration as shown below.
842713A1.CDR
UR IED 1
UR IED 2
UR IED 3
842714A1.CDR
UR IED 1
TX1
RX1
UR IED 2
RX2
TX2
RX1
TX1
UR IED 3
RX1
TX1
Содержание G60 UR Series
Страница 2: ......
Страница 4: ......
Страница 12: ...xii G60 Generator Protection System GE Multilin TABLE OF CONTENTS ...
Страница 32: ...1 20 G60 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 102: ...3 48 G60 Generator Protection System GE Multilin 3 4 MANAGED ETHERNET SWITCH MODULES 3 HARDWARE 3 ...
Страница 132: ...4 30 G60 Generator Protection System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 392: ...5 260 G60 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 418: ...6 26 G60 Generator Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Страница 446: ...8 18 G60 Generator Protection System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 452: ...9 6 G60 Generator Protection System GE Multilin 9 1 PHASE DISTANCE THROUGH POWER TRANSFORMERS 9 THEORY OF OPERATION 9 ...
Страница 482: ...A 12 G60 Generator Protection System GE Multilin A 1 PARAMETER LISTS APPENDIXA A ...
Страница 604: ...D 10 G60 Generator Protection System GE Multilin D 1 IEC 60870 5 104 APPENDIXD D ...
Страница 616: ...E 12 G60 Generator Protection System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...
Страница 634: ...x G60 Generator Protection System GE Multilin INDEX ...