7 COMMANDS AND TARGETS
7.1 COMMANDS
7
sured signals are raw inputs to the PMU under test, their independently captured record, processed using third-party soft-
ware, is a good reference point for accuracy calculations. Such a record proves useful when discussing the test results, and
should be retained as a part of the testing documentation.
Note that the PMU under such test does not have to be connected to a real GPS receiver as the accuracy is measured with
respect to the timing reference provided to the PMU and not to the absolute UTC time. Therefore a simple IRIG-B genera-
tor could be used instead. Also, the test set does not have to support GPS synchronization. Any stable signal source can
be used. If both the PMU under test and the test set use the timing reference, they should be driven from the same IRIG-B
signal: either the same GPS receiver or IRIG-B generator. Otherwise, the setpoints of the test set and the PMU measure-
ments should not be compared as they are referenced to different time scales.
Figure 7–2: USING THE PMU ONE-SHOT FEATURE TO TEST SYNCHROPHASOR MEASUREMENT ACCURACY
COLLECTING SYNCHRONIZED MEASUREMENTS AD HOC:
The one-shot feature can be used for ad hoc collection of synchronized measurements in the network. Two or more PMU
can be pre-scheduled to freeze their measurements at the same time. When frozen the measurements could be collected
using EnerVista UR Setup or a protocol client.
Содержание G60 UR Series
Страница 2: ......
Страница 4: ......
Страница 12: ...xii G60 Generator Protection System GE Multilin TABLE OF CONTENTS ...
Страница 32: ...1 20 G60 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 102: ...3 48 G60 Generator Protection System GE Multilin 3 4 MANAGED ETHERNET SWITCH MODULES 3 HARDWARE 3 ...
Страница 132: ...4 30 G60 Generator Protection System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 392: ...5 260 G60 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 418: ...6 26 G60 Generator Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Страница 446: ...8 18 G60 Generator Protection System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 452: ...9 6 G60 Generator Protection System GE Multilin 9 1 PHASE DISTANCE THROUGH POWER TRANSFORMERS 9 THEORY OF OPERATION 9 ...
Страница 482: ...A 12 G60 Generator Protection System GE Multilin A 1 PARAMETER LISTS APPENDIXA A ...
Страница 604: ...D 10 G60 Generator Protection System GE Multilin D 1 IEC 60870 5 104 APPENDIXD D ...
Страница 616: ...E 12 G60 Generator Protection System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...
Страница 634: ...x G60 Generator Protection System GE Multilin INDEX ...