Modifications reserved
Page 100/103
OPM_LPS_33E_60K_M12_2GB_V010.doc
Operating Manual
LP 33 Series 60-80-100-120 kVA / S2
10.2.2 Optional battery cabinet connection
WARNING !
The installation and cabling of the options must be performed by
QUALIFIED SERVICE PERSON.
Make sure that the UPS installation is completely powered down and the cabinet
battery fuses must be open.
Check for sufficient floor loading capacity (see
Technical Data Sheet)
.
Before closing the battery fuses verify for correct polarity of the battery connection.
The battery cabinet, with standard cables,
must be located on the left side of the UPS
(see
Fig. 10.2.2-1)
.
LPS33_0
60-080_S
2_Conne
ction batte
ry cabinet
_01
Mains 1
X4
Battery
Load
X1
X3
L1
-1
L2
-1
L3
-1
N1
PE
L1
L2
L3
N2
PE
-
0
+
PE
Mains 2
X2
L1
-2
L2
-2
L3
-2
N
_
0
_
PE
LP 33 Series 60 - 80 kVA
Mains 1
X4
Battery
Load
X1
X3
Mains 2
X2
LP 33 Series 100 - 120 kVA
PE
LPS33_1
00-120_S
2_Conne
ction batt
ery cabin
et_01
_
0
_
L1-
1
-
0
+
L2-
1
L3-
1
N1
L1-
2
L2-
2
L3-2
L1
L2
L3
N2
PE
PE
N
PE
Max. 5m
m / 2"
OFF
ON
OFF
ON
!
_
0
_
_
0
_
A
PE
LPS33_0
60-080_S
2_UPS+b
attery cab
inet_01
Main ground (PE) cables must be connected to bus-bar
with
M8
bolts
Clamp the cables with the included cable-ties
“
A
”
.
X4 Battery - External battery connection
-
= Negative pole of the battery
0
= Central point of battery blocks
+
= Positive pole of the battery
PE
= Battery cabinet ground
Fig. 10.2.2-1 Optional battery cabinet assembly and connection
External battery fuses
LP 33 Series 60 kVA
LP 33 Series 80 kVA
LP 33 Series 100 kVA
LP 33 Series 120 kVA
3x125Agl – 550Vdc – NH00 3x160Agl – 550Vdc - NH00 3x200Agl – 440Vdc – NH1 3x250Agl – 440Vdc – NH1
OF F
ON
OF F
ON
LP
S3
3_
06
0-
12
0_
S2
_U
P
S
+
P1
-J
28_
01
J28
P1 - Control board
Q2
ON
OFF
Q2
ON
OF F
LP 33 Series 60 - 80 kVA
LP 33 Series 100 - 120 kVA
Fig. 10.2.2-2
PCB P1 – Control board
Connect the Battery temperature probe
J28
to the
P1
– Control board
.
This probe compensates the battery charging current
in function of the ambient temperature of the
battery.
The cable with the connector
J28
must be laid in a
separated conduit protected from the external
electromagnetic fields.