7-6
C60 Breaker Protection System
GE Multilin
7.1 COMMANDS
7 COMMANDS AND TARGETS
7
sured signals are raw inputs to the PMU under test, their independently captured record, processed using third-party soft-
ware, is a good reference point for accuracy calculations. Such a record proves useful when discussing the test results, and
should be retained as a part of the testing documentation.
Note that the PMU under such test does not have to be connected to a real GPS receiver as the accuracy is measured with
respect to the timing reference provided to the PMU and not to the absolute UTC time. Therefore a simple IRIG-B genera-
tor could be used instead. Also, the test set does not have to support GPS synchronization. Any stable signal source can
be used. If both the PMU under test and the test set use the timing reference, they should be driven from the same IRIG-B
signal: either the same GPS receiver or IRIG-B generator. Otherwise, the setpoints of the test set and the PMU measure-
ments should not be compared as they are referenced to different time scales.
Figure 7–2: USING THE PMU ONE-SHOT FEATURE TO TEST SYNCHROPHASOR MEASUREMENT ACCURACY
Collecting synchronized measurements
ad hoc
:
The one-shot feature can be used for ad hoc collection of synchronized measurements in the network. Two or more PMU
can be pre-scheduled to freeze their measurements at the same time. When frozen the measurements could be collected
using EnerVista UR Setup or a protocol client.
7.1.7 SECURITY
i
PATH: COMMANDS
SECURITY
With the CyberSentry option, this setting is available to enable or disable the following commands:
•
Administrator Logoff:
Selecting ‘Yes’ allows the Supervisor to forcefully logoff an administrator session.
•
Engineer Logoff:
Selecting ‘Yes’ allows the Supervisor to forcefully logoff an engineer session.
•
Operator Logoff:
Selecting ‘Yes’ allows the Supervisor to forcefully logoff an operator session.
•
Clear Security Data
: Selecting ‘Yes’ allows the Supervisor to forcefully clear all the security logs and clears all the
operands associated with the self-tests.
Targets
SECURITY
ADMINISTRATOR
LOGOFF: No
Range: Yes, No
Default: No
ENGINEER
LOGOFF: No
Range: Yes, No
Default: No
OPERATOR
LOGOFF: No
Range: Yes, No
Default: No
CLEAR SECURITY DATA:
Range: Yes, No
Default: No
Содержание C60
Страница 10: ...x C60 Breaker Protection System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C60 Breaker Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 420: ...5 284 C60 Breaker Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 423: ...GE Multilin C60 Breaker Protection System 6 3 6 ACTUAL VALUES 6 1 OVERVIEW 6 FIRMWARE REVISIONS See page 6 28 ...
Страница 466: ...8 4 C60 Breaker Protection System GE Multilin 8 1 FAULT LOCATOR 8 THEORY OF OPERATION 8 ...
Страница 478: ...9 12 C60 Breaker Protection System GE Multilin 9 6 DISPOSAL 9 MAINTENANCE 9 ...
Страница 492: ...A 14 C60 Breaker Protection System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Страница 648: ...E 10 C60 Breaker Protection System GE Multilin E 1 OVERVIEW APPENDIX E E ...
Страница 660: ...F 12 C60 Breaker Protection System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...
Страница 670: ...H 8 C60 Breaker Protection System GE Multilin H 2 ABBREVIATIONS APPENDIX H H Z Impedance Zone ...
Страница 672: ...H 10 C60 Breaker Protection System GE Multilin H 3 WARRANTY APPENDIX H H ...
Страница 682: ...x C60 Breaker Protection System GE Multilin INDEX ...