
Maintenance: Electrical Safety Tests
3-24
DASH 2000 Patient Monitor
Revision A
2000 412-001
9.
Set the leakage tester power switch to OFF and remove the meter
lead connected in step 2.
Test Completion
Disconnect all test equipment from the device. Disconnect the device
power cord plug from the leakage tester power receptable. Disconnect the
leakage tester from the wall receptable.
Power cord
Probe to exposed conductive chassis
NORM
RVS
HIGH
LOW
GND
Device
under
test
P
o
w
er cord
GND
M.D.
(Measuring Device)
Leakage Tester
Partial Schematic
Содержание marquette Dash 2000
Страница 12: ...Contents viii DASH 2000 Patient Monitor Revision A 2000 412 001 ...
Страница 82: ...Maintenance Repair Log 3 36 DASH 2000 Patient Monitor Revision A 2000 412 001 ...
Страница 156: ...UPPER LEVEL ASSEMBLY Spare Parts List 7 10 DASH 2000 Patient Monitor Revision A 2000 412 001 ...
Страница 157: ...Revision A DASH 2000 Patient Monitor 8 1 2000 412 001 8 ASSEMBLY DRAWINGS Contents ...
Страница 159: ......
Страница 173: ......
Страница 178: ......
Страница 180: ......
Страница 181: ......
Страница 182: ......
Страница 184: ......
Страница 196: ......
Страница 197: ......
Страница 198: ......
Страница 200: ......
Страница 201: ......