GREER COMPANY
Crane Systems
GREER COMPANY 1918 East Glenwood Place, Santa Ana, CA 92705 TEL: (714) 259-9702 FAX: (714) 259-7626
MicroGuard® RCI 510/400 CALIBRATION MANUAL PN W450189A 09/09/02
17 of 65
COMMAND 03 ZERO - PRESSURE TRANSDUCERS
continued
COMMAND 03 ZERO ROUTINE - PRESSURE TRANSDUCERS
IMPORTANT:
ENSURE THAT THE BOOM IS IN A HORIZONTAL POSITION WHEN PERFORMING THIS
ROUTINE.
1)
PRESS A
TO
03 ZERO SENSOR
.
2)
PRESS C
TO
START THE COMMAND.
THE DISPLAY SHOULD READ:
ZERO TX. 0 XXXX (ACTUAL input).
3)
PRESS C
TO START CALIBRATION OF TX. 0. SENSOR.
4)
PRESS C
TO
CALIBRATE OR
PRESS D
TO ABORT THE CALIBRATION OF TX. 0.
AFTER THE MESSAGE,
“CALIBRATING”
ENDS
,
THE DISPLAY SHOULD READ:
ZERO TX. 0 XXXX (ZEROED input).
5)
PRESS A
TO ZERO TX. 1. 0.
6)
PRESS C
TO START CALIBRATION OF TX.1 SENSOR.
7)
PRESS C
TO CALIBRATE OR
PRESS D
TO ABORT THE CALIBRATION OF TX. 1.
AFTER THE MESSAGE,
“CALIBRATING”
ENDS
,
THE DISPLAY SHOULD READ:
ZERO TX.1 XXXX
(ZEROED input).
8)
PRESS D
TO EXIT ROUTINE.
Reconnect all hydraulic lines and reinstall the tank pressure relief valve before resuming crane
operation.
ORs Full
9.7Klb Ctwt
ERECTED 60' TELEJIB 17 AUXHD ON
PICK FROM MAIN BOOM FRONT WINCH
TEST
MAX
SET
360
o
6
23,500
i2,300
44.8
62.7
26.4
o
C
D
B
A
03 Zero Sensor