GREER COMPANY
Crane Systems
GREER COMPANY 1918 East Glenwood Place, Santa Ana, CA 92705 TEL: (714) 259-9702 FAX: (714) 259-7626
MicroGuard® RCI 510/400 CALIBRATION MANUAL PN W450189A 09/09/02
36 of 65
COMMAND 06 PRESSURE
continued
COMMAND 06 PRESSURE ROUTINE
CONTINUED
9)
PRESS
C
TO START THE LOAD CALIBRATION.
10)
PRESS
C
TO CONFIRM OR
PRESS
D
TO ABORT THE CALIBRATION.
WITH THE LOAD STILL ON THE GROUND,
THE LOAD DISPLAY SHOULD READ: “ZERO.”
11)
RAISE THE CALIBRATION LOAD.
THE DISPLAY SHOULD READ THE EXACT VALUE OF THE CALIBRATION LOAD,
AS ENTERED.
IF THE DISPLAYED LOAD IS NOT THE LOAD ENTERED,
REPEAT THE ENTIRE ROUTINE.
12)
PRESS
D
TO EXIT THE ROUTINE.