Figure 34: Locking the cable clamp of a PSU
▶
Pull the cable clamp up (1).
▶
Thread the power cord through the cable clamp (2).
▶
Press the cable clamp down until it engages to secure the cable (3).
It will take about 60 seconds until the server can be powered on.
4.7
Switching on the server
CAUTION
▶
Before switching on the server, make sure the top cover is closed.
In order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
server must not run while the top cover is removed.
▶
"Important information" on page 33
.
▶
Press the On/Off button to start up the server.
▶
Ensure that the power-on indicator is lit green.
Basic hardware procedures
TX2550 M5
Upgrade and Maintenance Manual
83
Содержание PRIMERGY TX2550 M5
Страница 20: ...Content Upgrade and Maintenance Manual TX2550 M5 ...
Страница 106: ...Basic hardware procedures 106 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 322: ...Fans 322 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 392: ...Expansion cards and backup units 392 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 408: ...Main memory 408 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 428: ...Processor CPU 428 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 522: ...System board and components 522 Upgrade and Maintenance Manual TX2550 M5 ...
Страница 590: ...FUJITSU Server PRIMERGY TX2550 M5 System Cabling Overview System Cabling Overview English Cable plan for May 2019 ...
Страница 631: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...