897N200877B
4-23
Chapter 4
Prepara
tion and Inspectio
n
4.6.2 Connecting to Processor
WARNING
• Firmly connect the video connector of the endoscope and the processor. If the video
connector is not connected properly, the endoscopic image may flicker or be lost, which
may cause patient injury, bleeding and/or perforation.
(1)
(2)
(1)
Align the index on the video connector and that on the 500 system connector socket of the
processor, and insert the video connector into the processor.
(2)
Rotate the lock handle clockwise while pressing the video connector further into the processor
to secure the connector.
(3)
Attach a dedicated connector cap to the connector socket that is not in use.
Light Source
Processor
Water Tank
4.6 Connecting Endoscope to Light Source, Processor and Related Equipment
Suction Unit
ED580XT_E2-30_897N200877B.indb 23
2018/09/20 15:50:23
Содержание ED-580XT
Страница 2: ...ii 897N200877B ED580XT_E2 30_897N200877B indb 2 2018 09 20 15 50 15...
Страница 12: ...897N200877B 4 Introduction ED580XT_E2 30_897N200877B indb 4 2018 09 20 15 50 16...
Страница 32: ...897N200877B 1 20 Chapter 1 Precautions ED580XT_E2 30_897N200877B indb 20 2018 09 20 15 50 17...
Страница 35: ...897N200877B 2 3 Chapter 2 Product Overview ED580XT_E2 30_897N200877B indb 3 2018 09 20 15 50 17...
Страница 48: ...897N200877B 2 16 Chapter 2 Product Overview ED580XT_E2 30_897N200877B indb 16 2018 09 20 15 50 19...
Страница 52: ...897N200877B 3 4 Chapter 3 Workflow ED580XT_E2 30_897N200877B indb 4 2018 09 20 15 50 19...
Страница 82: ...897N200877B 4 30 Chapter 4 Preparation and Inspection ED580XT_E2 30_897N200877B indb 30 2018 09 20 15 50 23...
Страница 114: ...897N200877B 6 12 Chapter 6 Troubleshooting ED580XT_E2 30_897N200877B indb 12 2018 09 20 15 50 25...
Страница 116: ...897N200877B 7 2 Chapter 7 Service ED580XT_E2 30_897N200877B indb 2 2018 09 20 15 50 25...
Страница 134: ...897N200877B Appendix 18 Appendix ED580XT_E2 30_897N200877B indb 18 2018 09 20 15 50 27...