Automatic run of cross conveyor screw
Runtime of cross conveyor screw 1 in automatic runtime.
Hopper 1... 3
System menu
Fuel
feed
Conveyor
Hopper
Hopper runtime
Hopper rotary agitator runtime at interval.
Switch-on ratio hopper
Defines the hopper pause time. The set value corresponds
to the percentage of the interval for the set runtime
(“Hopper runtime” parameter).
Example: Runtime of the hopper 8 s / switch-on ratio =
20%
8 seconds equate to 20% of the interval. The interval thus
lasts 40 seconds and the pause time is 32 seconds.
The switching of the two parameters is defined by the
current consumption of the hopper. Low current
consumption = bunker empty, high current consumption =
bunker full.
Hopper startup delay minimum fill level
Material is requested if the minimum fill level is detected
within this time.
Hopper shutdown delay maximum fill level
The material request is stopped if the fill level does not fall
below this level within this time.
Hopper filling timeout
If the hopper is not filled within this period of time, an error
is triggered.
Menus and parameters
5
Fuel feed
Service manual SPS 4000 | B0960622_en
59
Содержание SPS 4000
Страница 114: ...7 Electric components and wiring PLC 114 Fröling GesmbH A 4710 Grieskirchen Industriestraße 12 www froeling com ...
Страница 142: ...8 Notes 8 Notes 142 Fröling GesmbH A 4710 Grieskirchen Industriestraße 12 www froeling com ...
Страница 143: ...Notes 8 Service manual SPS 4000 B0960622_en 143 ...