❒ In the “
Feed screw 1
” submenu for parameter “
Feed screw 1 loaded by
” select the entry “Feed
screw 2”
❒ In the “
Feed screw 2
” submenu for parameter “
Feed screw 2 loaded by
” select the entry “Feed
screw 3”
❒ In the “
Feed screw 3
” submenu for parameter “
Feed screw 3 loaded by
” select the entry “Rotary
agitator separately driven 1, outflow 1”
❒ Set the parameter “
Rotary agitator 1 permanently active
” to “Yes”
➥ If there is a problem with the master system, the rotary agitator remains active for the slave system
❒ Parameterise the remaining feed screws on slave 1; select the entry “Cascade master” for the loading of
feed screw 2
5.8.6 Ash removal
System menu
System configuration
Ash removal
Ash removal combustion chamber installed?
Specifies whether the boiler has an ash screw.
Ash removal heat exchanger installed?
Specifies whether ash removal from the heat exchanger is
available.
Ash removal combustion chamber active with ash removal
heat exchanger?
Specifies whether the ash removal line section of the
combustion chamber should be activated together with the
ash removal from the heat exchanger for joint ash
removal.
5
Menus and parameters
System configuration
84
Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
Содержание SPS 4000
Страница 114: ...7 Electric components and wiring PLC 114 Fröling GesmbH A 4710 Grieskirchen Industriestraße 12 www froeling com ...
Страница 142: ...8 Notes 8 Notes 142 Fröling GesmbH A 4710 Grieskirchen Industriestraße 12 www froeling com ...
Страница 143: ...Notes 8 Service manual SPS 4000 B0960622_en 143 ...